My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification <br />Section <br />Specification <br />Required <br />Required Submittal <br />Submittal <br />Type <br />Due Date or <br />Delivery Time <br />02610 <br />HDPE Pipe <br />Manufacturer's Cut <br />Sheets <br />For Approval <br />Prior to installation <br />02610 <br />Stainless Steel Valves <br />and Fittings <br />Shop Drawings and <br />Cut Sheets <br />For Approval <br />Prior to installation <br />02620 <br />HDPE Liner <br />Manufacturer Info. <br />For Approval <br />Prior to installation <br />02620 <br />HDPE Liner <br />QC Manuals and <br />Certificates <br />For Approval <br />Prior to installation <br />02620 <br />HDPE Liner <br />Daily Reports <br />For Approval <br />Daily <br />02620 <br />HDPE Liner <br />Subgrade <br />Certifications <br />For Approval <br />Prior to liner <br />placement <br />02620 <br />HDPE Liner <br />Samples <br />For Approval <br />Per Specifications <br />1.5 GUARANTEES, WARRANTIES, AND CERTIFICATES <br />A. Submit all guarantees, warranties, and certificates before final payment. <br />1.6 TEST REPORTS <br />A. Refer to Section 01450: Quality Assurance /Quality Control <br />PART 2- PRODUCTS <br />Not applicable. <br />PART 3 - EXECUTION <br />Note: Submittals are not included for Technical Specification Sections not included in this design submittal. <br />See Table of Contents for sections included. <br />PART 4 - MEASUREMENT AND PAYMENT <br />4.1 MEASUREMENT <br />A. All work required in this section shall not be measured for Payment. <br />4.2 PAYMENT <br />A. Compensation to the Contractor for all work required in this section shall <br />be included in the prices bid in the schedule for the items for which <br />submittals are required. No separate payment to the Contractor shall be <br />made for the work required in this section. <br />Rio Grande Silver Tailings Evaporation Pond <br />August <br />Table 1 List of submittals <br />END OF SECTION 01330 <br />01330 -2 Submittals <br />01330 <br />
The URL can be used to link to this page
Your browser does not support the video tag.