Laserfiche WebLink
Specification <br />Section <br />Specification <br />Required <br />Required Submittal <br />Submittal <br />Type <br />Due Date or <br />Delivery Time <br />02610 <br />HDPE Pipe <br />Manufacturer's Cut <br />Sheets <br />For Approval <br />Prior to installation <br />02610 <br />Stainless Steel Valves <br />and Fittings <br />Shop Drawings and <br />Cut Sheets <br />For Approval <br />Prior to installation <br />02620 <br />HDPE Liner <br />Manufacturer Info. <br />For Approval <br />Prior to installation <br />02620 <br />HDPE Liner <br />QC Manuals and <br />Certificates <br />For Approval <br />Prior to installation <br />02620 <br />HDPE Liner <br />Daily Reports <br />For Approval <br />Daily <br />02620 <br />HDPE Liner <br />Subgrade <br />Certifications <br />For Approval <br />Prior to liner <br />placement <br />02620 <br />HDPE Liner <br />Samples <br />For Approval <br />Per Specifications <br />1.5 GUARANTEES, WARRANTIES, AND CERTIFICATES <br />A. Submit all guarantees, warranties, and certificates before final payment. <br />1.6 TEST REPORTS <br />A. Refer to Section 01450: Quality Assurance /Quality Control <br />PART 2- PRODUCTS <br />Not applicable. <br />PART 3 - EXECUTION <br />Note: Submittals are not included for Technical Specification Sections not included in this design submittal. <br />See Table of Contents for sections included. <br />PART 4 - MEASUREMENT AND PAYMENT <br />4.1 MEASUREMENT <br />A. All work required in this section shall not be measured for Payment. <br />4.2 PAYMENT <br />A. Compensation to the Contractor for all work required in this section shall <br />be included in the prices bid in the schedule for the items for which <br />submittals are required. No separate payment to the Contractor shall be <br />made for the work required in this section. <br />Rio Grande Silver Tailings Evaporation Pond <br />August <br />Table 1 List of submittals <br />END OF SECTION 01330 <br />01330 -2 Submittals <br />01330 <br />