My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
communications coordinator, the Project Manager shall serve as a liaison <br />between all parties involved in the project to ensure that ongoing <br />communications are maintained. The Project Manager shall be <br />responsible for the resolution of all CQA issues that arise during <br />construction <br />E. DESIGN ENGINEER: The Design Engineer is the individual or firm <br />responsible for the design and preparation of the project construction <br />Drawings and project Specifications. The Design Engineer is responsible <br />for approving all design and project specification changes, modifications, <br />or clarifications encountered during construction. <br />F. CONSTRUCTION QUALITY ASSURANCE MONITOR: The Construction <br />QA Monitor, also referred to as the "CQA Monitor," is a representative of <br />the Design Engineer and is the individual responsible for performing the <br />CQA tasks outlined in this plan. The CQA Monitor is the official CQA <br />representative of Rio Grande Silver and has the responsibility of <br />overseeing the CQA aspects of the project and immediately report to the <br />Project Manager and Design Engineer any aspect of the work that is not <br />incompliance with the QA plan. The specific responsibilities of the CQA <br />Monitor include: <br />Rio Grande Silver Tailings Evaporation Pond <br />Review the design Drawings, project Specifications, and <br />related guidance documents. <br />Review all Contractor QC submittals and make appropriate <br />recommendations and approvals. <br />Obtain and test geosynthetic conformance samples during <br />geosynthetics manufacture. <br />Observe geosynthetic material delivery, unloading, and <br />storage. <br />Verify and observe prepared subgrade prior to <br />geosynthetic deployment. <br />Monitor and document geosynthetic material placement, <br />trial seam testing, non - destructive testing, seaming and <br />repair operations, and destructive testing. <br />Identify seam samples for CQA destructive testing. <br />Assure that testing equipment used, and tests performed <br />are conducted according to project Specifications and <br />industry standards. <br />Perform or observe, document, and report test results to <br />the Project Manager as required. <br />Report any QA deficiencies and document status of <br />corrected work to the Project Manager and Design <br />Engineer. <br />01450 -2 Quality Assurance /Quality Control <br />August 2011 01450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.