work day. Each seamer shall make at least one trial seam each day. Seaming <br />operation shall not commence until the CQA Monitor, has determined that the <br />seaming process is meeting the specification requirement and is acceptable. <br />The CQA Monitor shall record the trial weld results on the trial seam log form. <br />Field Seaming - The CQA Monitor shall verify that only approved equipment and <br />personnel perform welding, all welding is performed under suitable conditions as <br />specified in the project Specifications, specified overlaps are achieved, seams <br />are oriented in compliance to project requirements, and that grinding techniques <br />and extrudate meet project requirements for extrusion welding. The CQA <br />Monitor shall record all field seaming on field seaming log forms. <br />Non - Destructive Seam Continuity Testing - The CQA Monitor shall verify that the <br />seams and repair are non - destructively tested by CQC personnel in compliance <br />with the project Specifications. If a seam cannot be tested, the CQA Monitor <br />shall ensure that CQC monitors observe cap strip operations. The CQA Monitor <br />shall verify that test equipment and gauges are functioning properly and that test <br />procedures are in compliance with the project Specifications. The CQA Monitor <br />shall verify that the seams and repairs with failing test results are repaired and /or <br />re- tested until passing results are achieved. The CQA Monitor shall record <br />observed non - destructive test locations on the vacuum test and pressure test log <br />forms. <br />Destructive Seam Testing - The Installer shall obtain samples, at locations <br />selected by the CQA Monitor, of the field seamed geosynthetic approximately 24 <br />inches along and 12 inches across the seam and centered over the seam as <br />follows: <br />• A minimum of one sample per day; <br />• A minimum of one sample for each geosynthetic seamer; <br />• A minimum of one sample every 750 ft of seaming is <br />required unless, in the opinion of the CQA Monitor, the <br />seamer has demonstrated sufficient quality /experience to <br />increase the seam sample interval. In no event shall the <br />sampling interval exceed 1000 ft; and <br />• Seams that appear suspect to the CQA Monitor. <br />The Installer's CQA Monitor shall witness the testing of destructive seam <br />samples by the Installer's CQC personnel. The Installer shall mark all samples <br />with their roll and seam number, date, machine number, welding technician <br />identification, extruder and nozzle /wedge temperature, and ambient air <br />temperature. <br />The Installer shall test all destructive samples in compliance with the project <br />Specifications. <br />Rio Grande Silver Tailings Evaporation Pond 02620 -12 Geosynthetic Liner <br />August2011 02620 <br />