My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
work day. Each seamer shall make at least one trial seam each day. Seaming <br />operation shall not commence until the CQA Monitor, has determined that the <br />seaming process is meeting the specification requirement and is acceptable. <br />The CQA Monitor shall record the trial weld results on the trial seam log form. <br />Field Seaming - The CQA Monitor shall verify that only approved equipment and <br />personnel perform welding, all welding is performed under suitable conditions as <br />specified in the project Specifications, specified overlaps are achieved, seams <br />are oriented in compliance to project requirements, and that grinding techniques <br />and extrudate meet project requirements for extrusion welding. The CQA <br />Monitor shall record all field seaming on field seaming log forms. <br />Non - Destructive Seam Continuity Testing - The CQA Monitor shall verify that the <br />seams and repair are non - destructively tested by CQC personnel in compliance <br />with the project Specifications. If a seam cannot be tested, the CQA Monitor <br />shall ensure that CQC monitors observe cap strip operations. The CQA Monitor <br />shall verify that test equipment and gauges are functioning properly and that test <br />procedures are in compliance with the project Specifications. The CQA Monitor <br />shall verify that the seams and repairs with failing test results are repaired and /or <br />re- tested until passing results are achieved. The CQA Monitor shall record <br />observed non - destructive test locations on the vacuum test and pressure test log <br />forms. <br />Destructive Seam Testing - The Installer shall obtain samples, at locations <br />selected by the CQA Monitor, of the field seamed geosynthetic approximately 24 <br />inches along and 12 inches across the seam and centered over the seam as <br />follows: <br />• A minimum of one sample per day; <br />• A minimum of one sample for each geosynthetic seamer; <br />• A minimum of one sample every 750 ft of seaming is <br />required unless, in the opinion of the CQA Monitor, the <br />seamer has demonstrated sufficient quality /experience to <br />increase the seam sample interval. In no event shall the <br />sampling interval exceed 1000 ft; and <br />• Seams that appear suspect to the CQA Monitor. <br />The Installer's CQA Monitor shall witness the testing of destructive seam <br />samples by the Installer's CQC personnel. The Installer shall mark all samples <br />with their roll and seam number, date, machine number, welding technician <br />identification, extruder and nozzle /wedge temperature, and ambient air <br />temperature. <br />The Installer shall test all destructive samples in compliance with the project <br />Specifications. <br />Rio Grande Silver Tailings Evaporation Pond 02620 -12 Geosynthetic Liner <br />August2011 02620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.