My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prior to geosynthetic installation, the CQA Monitor shall obtain samples of the <br />geosynthetic for conformance testing to confirm that these materials meet project <br />requirements. The conformance testing frequency shall be at a rate of one <br />(1) test per 400,000 square feet. Samples shall be taken across the entire width <br />of the roll and shall not include the first three feet (ft). The samples shall be 3 ft <br />wide by the roll width. The CQA Monitor shall mark the machine direction, roll <br />number on the sample, and date the sample was obtained, and forward the <br />sample to a third party geosynthetic laboratory. As a minimum, the following <br />conformance tests shall be conducted; with project requirements outlined in <br />these Specifications: <br />Geosynthetic: Density (ASTM D1505) <br />Carbon black content (ASTM D1603) <br />Thickness (ASTM D5199/D5994) <br />Tensile strength (ASTM D6693) <br />Puncture resistance (ASTM D4833) <br />AM conformance tests shall be performed in compliance with the project <br />Specifications. The CQA Monitor shall review the test results and shall report <br />any nonconformance to the Project Manager, Design Engineer, and the <br />Geosynthetics Installation Contractor. <br />a. QUALITY ASSURANCE <br />During geosynthetic installation, the CQA Monitor shall observe and document <br />deployment, trial seams, field seaming, non - destructive and destructive seam <br />testing, and repairs to assess that the installation is in compliance with the <br />Specifications. The scope of the CQA program has been established with the <br />goal of 100 percent coverage of deployment and seaming, with 75 percent <br />coverage of the CQC non - destructive testing, destructive testing, trial seams, and <br />repairs. <br />Deployment - The CQA Monitor shall verify that only approved materials are <br />used, each panel is given a unique panel number, no geosynthetic is placed <br />during unsuitable weather conditions as outlined in these Specifications, the <br />geosynthetic is not damaged during installation, and anchoring is performed in <br />compliance with the Specifications and design Drawings. The CQA Monitor shall <br />record the deployment on the deployment log form. <br />Trial Seams - The CQA Monitor shall verify that seaming conditions are <br />performed in compliance with the Specifications, tests are performed at required <br />intervals, specified test procedures are followed, and retests are performed in <br />compliance with the Specifications. If the ambient air temperature measured by <br />the CQA Monitor is above 32 °F for the entire day, the Installer shall perform trial <br />seams at the beginning of each crew shift, and immediately following any work <br />stoppage (i.e., for lunch, weather conditions, etc.) of 30 minutes or more for each <br />seaming apparatus used that day. If the ambient air temperature measured by <br />the CQA Monitor is below 32 °F for the entire day, the Installer shall perform four <br />(4) trial seams, at approximately the same time interval throughout the scheduled <br />Rio Grande Silver Tailings Evaporation Pond 02620 -11 Geosynthetic Liner <br />August 2011 02620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.