My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Contractor may use a hot air device ( "Leister ") to temporarily bond <br />geosynthetic panels that are to be extrusion welded. <br />5. Contractor shall use extrusion welding apparatus equipped with <br />gauges giving temperature of preheat and extrudate at nozzle of <br />apparatus. <br />6. Contractor shall use fusion welding apparatus which are self - <br />propelled devices equipped with a gauge indicating temperature of <br />heating element, and a gauge indicating the speed of the welding <br />apparatus. <br />B. Vacuum Testing (for extrusion seam only) <br />The equipment shall consist of the following: <br />1. Vacuum box assembly consisting of: rigid housing, transparent <br />viewing window, soft neoprene gasket attached to bottom of <br />housing or port hole and valve assembly, and vacuum gauge; <br />2. Pump assembly equipped with pressure controller and pipe <br />connections; <br />3. Rubber pressure /vacuum hose with fittings and connections; <br />4. Bucket of soapy solution; and <br />5. Wide paint brush, or other means of applying soapy solution. <br />C. Air Pressure Testing (for double fusion seam only) <br />The equipment shall consist of the following: <br />1. Air pump (manual or motor driven), equipped with a pressure <br />gauge, capable of generating, sustaining, and measuring pressure <br />between 25 to 35 psi and mounted on a cushion to protect <br />geosynthetic; <br />2. Rubber hose with fittings and connections; <br />3. Sharp hollow needle, or other approved pressure feed device; and <br />4. An air pressure monitoring device with an accuracy of 1 psi. <br />PART 3 EXECUTION <br />3.1 PRE - INSTALLATION <br />Rio Grande Silver Tailings Evaporation Pond 02620 -10 Geosynthetic Liner <br />August2011 02620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.