My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Products and processes /included in the Specifications shall conform to <br />the manufacturer's latest published Specifications, as of the date <br />established for receipt of bids. <br />C. Provide sworn affidavits from Manufacturers certifying that material, <br />products, and processes delivered and used on the project meet the <br />specified requirements. Affidavits shall not relieve the Contractor from <br />responsibility for full compliance with the requirements of the <br />Specifications. <br />1.5 ENVIRONMENTAL PROTECTION <br />A. Prevent, abate, and control all environmental pollution arising from <br />construction activities by complying with all applicable Federal, State, and <br />local laws and regulations concerning environmental pollution control and <br />abatement. <br />1.6 COORDINATION <br />A. Coordinate work so that other Rio Grande Silver operations are not <br />restricted or otherwise adversely impacted. <br />1.7 PROTECTION <br />A. The Contractor shall protect and carefully perform all work around <br />existing buildings, equipment, and vegetation. <br />B. Any damage as a result of the Contractor's actions shall be repaired by <br />the Contractor or the Contractor's agent at no cost to Rio Grande Silver. <br />1.8 PERMITS <br />A. Rio Grande Silver will be responsible for obtaining all necessary permits <br />required prior to commencing work. <br />PART 2 — PRODUCTS <br />Not applicable. <br />PART 3 — EXECUTION <br />Not applicable. <br />PART 4 — MEASUREMENT AND PAYMENT <br />Not applicable. <br />END OF SECTION 01110 <br />Rio Grande Silver Tailings Evaporation Pond 01110 -2 Summary of Work <br />August 2011 01110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.