Laserfiche WebLink
PART 4 - MEASUREMENT AND PAYMENT <br />4.1 MEASUREMENT <br />A. All work required in this section shall not be measured for payment. <br />4.2 PAYMENT <br />A. Compensation to the Contractor for all work required in this section shall <br />be included in the prices bid in the schedule for items for which quality <br />control testing is required. No separate payment to the Contractor shall <br />be made for the work required in this section. <br />Rio Grande Silver Tailings Evaporation Pond <br />END OF SECTION 01450 <br />Quality Assurance /Quality Control <br />01450 -13 <br />August 2011 01450 <br />