My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. The CQA Monitor shall prepare weekly progress reports summarizing all <br />construction and CQA activities. This report shall be submitted to the <br />Project Manager and shall include the following information: <br />• Date, project name, and location; <br />• Summary of construction related activities; <br />• Summary of geosynthetic deployed (per day); <br />• Summary of samples taken and test results; <br />• Summary of geosynthetic areas completed, and approved <br />for liner protection fill placement; <br />• Summary of deficiencies and /or defects and resolutions; <br />and <br />• Signature of the CQA Monitor. <br />At the completion of the project, the CQA Monitor shall submit to the <br />Project Manager a Construction Certification Report. This report shall <br />certify that the work has been performed in compliance with the design <br />Drawings and project Specifications and will contain the following <br />information: <br />• Summary of all construction activities; <br />• Observation and test data sheets; <br />• Photographic documentation; <br />• Contractor's subgrade acceptance forms; <br />Temperature monitoring results; <br />Geosynthetic QC documents; <br />Geosynthetic QA documents; <br />• Geosynthetic installation observations, such as for <br />deployment, trial seams, defect repair, destructive testing <br />and non - destructive testing; <br />• Sampling, testing locations, and test results; <br />• Changes to the design Drawings or project Specifications <br />and the justification for these changes; <br />• Record Drawings; and <br />• A certification statement that construction was completed <br />in compliance with the Drawings and Specifications, <br />signed, and sealed by the Design Engineer. <br />Rio Grande Silver Tailings Evaporation Pond 01450 -12 Quality Assurance /Quality Control <br />August2011 01450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.