2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Communication regarding QA/QC programs shall be directed through the <br />Project Manager. Under no circumstances, shall the QA Monitor or QA <br />personnel under his control direct the Contractor in his work. The QA <br />Project Manager may inform the Contractor of the deficiencies or <br />concerns of the work, but not direct the Contractor in correcting the <br />deficiencies or preventing stoppage of work. <br />C. Any deficient or noncompliant work or materials shall be corrected in a <br />timely manner at no cost to the Owner. This includes any and all <br />materials placed that require removal for access or correction of the <br />noncompliant material. <br />D. If there is a disagreement among the Design Engineer, Design Engineer <br />and /or Project Manager that cannot be resolved among themselves, <br />Project Manager shall present the matter to Rio Grande Silver with Project <br />Manager - related recommendations, and Rio Grande Silver shall decide <br />the matter with such decision being final. <br />3.3 QUALITY CONTROL <br />The Project Manager or the Owner shall direct all communications to the <br />Contractor with respect to correction of work or stoppage of the work as <br />needed to correct the problem. <br />A. QC shall be conducted by the Owner to ensure that the Work, including <br />that of subcontractors and suppliers, complies with the requirements of <br />the Contract Documents. The controls shall be adequate to cover all <br />construction operations, including both on -site and off -site activities. <br />Required testing and inspections are presented in the individual <br />Specifications. <br />B. The QC shall include at least three phases of control to be conducted by <br />the Owner for all definable features of work as defined in this <br />Specification. <br />1. Pre - Construction Phase: This phase shall be performed before <br />beginning work on each definable feature of work and shall <br />include the following: <br />a. A review of applicable Design Drawings and Technical <br />Specifications. <br />b. A check to assure that all proposed materials and <br />equipment have been tested, submitted, and approved. <br />c. A check to assure that provisions have been made to <br />provide required inspection and testing. <br />d. Examination of the work area to assure that all required <br />preliminary work has been completed and is in compliance <br />with the Contract. <br />e. A physical examination of required materials, equipment, <br />and sample work to assure that they are on hand, conform <br />Rio Grande Silver Tailings Evaporation Pond <br />Quality Assurance /Quality Control <br />01450 -5 <br />August 2011 01450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.