Laserfiche WebLink
to approved shop Drawings or submitted data, and are <br />properly stored. <br />f. A review of the appropriate activity hazard analysis to <br />assure safety requirements are met in accordance with the <br />Health and Safety Plan. <br />g. Discussion of procedures for constructing the work <br />including repetitive deficiencies. Document construction <br />tolerances and workmanship standards for that phase of <br />work. <br />2. Construction Phase: This phase shall be accomplished at the <br />beginning of a definable feature of work. The following shall be <br />accomplished: <br />a. A check of preliminary work to ensure that it is in <br />compliance with Contract requirements. <br />b. Verification of full Contract compliance. Verify required QC <br />inspection and testing. <br />c. Establish level of workmanship and verify that it meets <br />minimum acceptable workmanship standards. <br />d. Resolve all differences. <br />e. Review safety procedures and the activity hazard analysis <br />to assure compliance with the Health and Safety Plan. <br />3. Post - Construction Phase: Daily checks shall be performed to <br />assure continuing compliance with Contract requirements, <br />including QC testing, until completion of the particular feature of <br />work. Final follow -up checks shall be conducted and all <br />deficiencies corrected before the start of additional features of <br />work that may be affected by the deficient work. The Contractor <br />shall not build on or conceal non - conforming work. <br />4. QC Testing: The Contractor shall perform tests specified or <br />require to verify that QC measures are adequate to provide a <br />product that conforms to Contract requirements. Testing includes <br />operation and acceptance tests when specified. The Contractor <br />shall procure the services of an approved testing laboratory or <br />establish an approved testing laboratory at the project site. The <br />Contractor shall perform the following activities and record and <br />provide the following data: <br />a. Verify that testing procedures comply with Contract <br />requirements. <br />b. Verify that facilities and testing equipment are available <br />and comply with testing standards. <br />c. Check test instrument calibration data against certified <br />standards. <br />d. Verify that recording forms and test identification control <br />number system, including all of the test documentation <br />requirements, have been prepared. <br />Rio Grande Silver Tailings Evaporation Pond 01450 -6 Quality Assurance /Quality Control <br />August2011 01450 <br />