My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-20_APPLICATION CORRESPONDENCE - C2010088
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2011-07-20_APPLICATION CORRESPONDENCE - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:50 PM
Creation date
8/10/2011 9:40:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
7/20/2011
Doc Name
3rd Preliminary Adequacy Review
From
Marica Talvitie
To
Mike Boulay
Email Name
MPB
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C- 2010 -088 Fruita Loadout <br />Yd Preliminary Adequacy Review (MLT) <br />20 -Jul -2011 <br />Page 9 of 10 <br />2.06.6 Special Categories of Mining <br />99a. Under 2.06.6 Prime Farmlands, please provide a reference to the letter from MRCS in <br />Exhibit 8. <br />Reference to the MRCS letter has been included on page 2.06 -1. Item resolved. <br />2.10 Maps and Plans - Text <br />116a. Section 2.10.3(1)(b) makes the statement that the land within the permit boundary is <br />owned by the Applicant. With the addition of the Construction Material Borrow Area on <br />property owned by Tavistock Partners, LLC, and the Haul Road #1 easement on Fruita <br />Development, LLC, this statement appears to be in error. Please revise this paragraph as <br />appropriate. <br />CAM has added text to page 2.20 -2 which clarifies the land ownership. Item resolved. <br />Maps 10 11 and 12 Pre- and Post-Mining TopogrEhy and Cross Sections <br />116b. Please add an additional cross section which passes through the Buried Coke Fines Area <br />and crosses the Access Road, Haul Road 92, Rail Loop, and the Truck Dump, following the <br />alignment of the 96" CMP tunnel. <br />New Section H -H' has been added to Map 12. Item resolved. <br />116c. On Map 12 Sections E -E' and F -F', please revise the drawing to accurately portray the <br />proposed dimensions of Haul Road #1, the proposed BMPs, and the limits of the 30' <br />easement. <br />Sections E -E' and F -F' have been revised as requested. Item resolved. <br />116d. Please provide the horizontal and vertical scales for Section G -G' on Map 12, <br />Map 12 has been revised as requested.. Item resolved. <br />Map 13 Drainage Plan Ponds 1 & 2 <br />116e. Please label ponds 1 and 2 in the Plan view. <br />Ponds 1, 2, 3 and 4 have been labeled in the Plan view on Map 13. Item resolved. <br />116f. Please provide the contour interval for the plan view, and label the contour lines. <br />The contour interval (2 foot) has been provided, and even - numbered lines are labeled. <br />Item resolved. <br />1168. The vertical scale on the Sections appears to be 1" = 10' rather than 1" = 5'. Please <br />revise as appropriate <br />Map 13 was revised as requested. However, for new Section H -H ; the vertical scale <br />appears to be 1 "= 6' rather than l " =5', as shown. Please revise, as appropriate. <br />May 15 Haul Road Plan and Profile <br />
The URL can be used to link to this page
Your browser does not support the video tag.