My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - M1981185 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-09_REVISION - M1981185 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:16 PM
Creation date
8/10/2011 8:53:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/9/2011
Doc Name
CN-01 112d permit application Exhibit A thru F
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R 2INCORPORATED <br />ENVIRONMENTAL AND ENGINEERING SERVICES <br />STRATEGICALLY POSITIONED - TECHNICALLY PREPARED <br />MAY DAY IDAHO MINE COMPLEX <br />WILDCAT MINING CORPORATION <br />ORIGINAL 112d PERMIT <br />EXHIBIT D <br />Mining Plan <br />Rule 6.4.4 <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />5555 DTC Parkway Suite A -4000, Greenwood Village, Colorado 80111 <br />Phone: (303) 832 -7664 I Fax: (303) 832 -7469 <br />Revised: August 2011 <br />GEORGE M.L. ROBINSON,P.G. <br />J. ERICH RALIBER,P.E. <br />6.4.4(a) Description of the method(s) of mining to be employed in each stage of the <br />operation as related to any surface disturbance on affected lands <br />Mining activities are planned to be conducted in the following phases and in accordance with the <br />Joint Stipulations and Rule 6.4.21(9) and 6.4.21(11) as proposed below: <br />When the mine permit is approved, Wildcat Mining Corporation (Wildcat) will immediately <br />initiate the following activities: <br />1. Install storm water management structures identified in exhibits and work <br />plans; <br />2. Initiate approved DRMS work plans and implementing the Environmental <br />Protection Plan ("EPP") (Exhibit U; Figure D -1; Attachment D -2, Figure 1; <br />and, Attachment D -1, Figure C6.10); <br />3. Mobilize a drill rig to complete the two monitoring wells and a production <br />well illustrated in Exhibit G -1; <br />4. Perform maintenance on pre- existing access roads; and <br />5. Take corrective measures as necessary to comply with enforcement actions <br />issued by others agencies, with written approval from the Division. <br />Wildcat will perform all activities in accordance with all applicable MSHA regulations and <br />state permit requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.