Laserfiche WebLink
Exhibit Table of Contents <br />Table of Contents <br />Exhibit <br />Exhibit D — Mining Plan <br />Figures <br />a. Figure D-1 — Environmental Protection Plan -Site Map <br />b. Figure D -2 — Schematic Diagram of the Mineral Processing Plant at the Idaho Mill Site <br />c. Figure D -3 — Mill Flow Sheet <br />d. Figure D -4 — May Day Mine Dry Stack Tailings Disposal Site <br />e. Attachment D -2 Figure D-1 — May Day No. 1 Surface Facilities <br />f. Attachment D -2 Figure D -2 — May Day No. 1 Portal Repair and Stormwater Control <br />Plan <br />Attachment D -3 Figure D -1— May Day No. 2 Stormwater Control Plan <br />Attachment D -4 Figure D -1 Chief Portal Little Deadwood Gulch, Stormwater Control <br />Plan <br />i. Attachment D -6 Figure D -1 - Payday and Idaho Mill Claim Site Figure 2 — Chief <br />Portal Stormwater Control Plan <br />g. <br />h. <br />Attachments <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />g. <br />h. <br />i. <br />Attachment <br />Attachment <br />Attachment <br />Attachment <br />Attachment <br />Attachment <br />Attachment <br />Attachment <br />Attachment <br />6.4.4 Exhibit D — <br />Mining Plan <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />August, 2011 <br />Exhibit Table of Contents <br />1 — New Access Road Construction Work Plan <br />2 — Portal Collapse Repair Work Plan May Day No. 1 <br />3 — Little Deadwood Gulch May Day No. 2 Drainage Control <br />4 — Chief Drainage Channel Reclamation Work Plan — Little Deadwood <br />Gulch <br />5 — Dry Stacked Tailings Work Plan <br />6 — Augmentation Pond Construction Work Plan <br />7 — Tailings Characterization Work Plan <br />8 — Whole Rock Sampling and Kinetic Testing Work Plan <br />9 — Surface Water and Seep Sampling <br />