My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-02_PERMIT FILE - M2011026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011026
>
2011-08-02_PERMIT FILE - M2011026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:26 PM
Creation date
8/8/2011 1:46:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011026
IBM Index Class Name
PERMIT FILE
Doc Date
8/2/2011
Doc Name
Cost Summary Form
From
DRMS
To
Keyah Grande
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />001 <br />07/29/2011 <br />KAP <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 6,455 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Consolidated stockpile <br />Material weight : <br />Weight description : <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Archuleta <br />Site :Keyah Grande <br />Abbreviation :none <br />Agency or organization name : Colorado Division Of Reclamation, Mining, And Safety <br />Permit or other job action : New <br />Task description : Spread Topsoil <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :reclamation Plan <br />Source of estimated swell factor :Earth -dry pack <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY /hr <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 7,200 feet <br />2,550 I bs /LCY <br />1 Dozer(s) <br />/LCY <br />$0.236 <br />Swell <br />factor : <br />:Cat D8R Series <br />:Semi-Universal <br />:ROPS Cab <br />:3-shank ripper <br />Filename : MO26 -001 <br />II - 8SU (200f. Horsepower : 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />$45.68 NA <br />$81.14 100 <br />$0.00 0 <br />$38.54 NA <br />$165.35 <br />Permit/job# :M -2011 -026 <br />Loose <br />1.125 volume : 7,262 LCY <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Adjusted unit production : 701.16 LCY /hr <br />Adjusted fleet production : 701.16 LCY /hr <br />Total job time : <br />Total job cost : <br />Total fleet cost/hour : <br />10.36 Hours <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.80 (fnd -rt) <br />1.11 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S /SU /U) <br />0.50 <br />$1,713 <br />$165.35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.