Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />002 <br />07/29/2011 <br />KAP <br />Permit or other job action : new <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : <br />Unadjusted production : <br />JOB TIME AND COST <br />Task description :Rip compacted areas <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />10.00 <br />Source of estimated quantity :reclamation plan <br />Source of estimated load factor :NA <br />Area : Avg. ripping depth : <br />Average ripping width : <br />Average ripping length : <br />Average dozer speed : <br />Average maneuver time : <br />Production per unit area : <br />Unadjusted production : <br />Fleet size : <br />Unit cost : <br />1.00 <br />7.08 <br />400.00 <br />88.00 <br />0.25 <br />0.813 <br />1,312.35 <br />1 <br />$0.157 <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County :Archuleta <br />Site :Keyah Grande <br />Agency or organization name : Colorad Diivsion Of Reclamation Mining And Safety <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />NA Load factor : <br />acres Rip depth (ft) : <br />NA feet/second <br />NA cu. yds. /hour <br />feet/pass <br />feet/pass <br />feet/pass <br />feet/minute <br />minutes /pass <br />acres /hour <br />cu. yds. /hour <br />dozer(s) <br />per cu. yd. <br />:Cat D8R Series <br />:Semi-Universal <br />:ROPS Cab <br />:3-shank ripper <br />$45.68 <br />$81.14 <br />$6.20 <br />$38.54 <br />$171.55 <br />Permit/job # : M -2011 -026 <br />Abbreviation :none <br />Filename : MO26 -002 <br />11- 8SU (200: Horsepower : 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA Bank volume : <br />1.00 Volume : <br />Site altitude : <br />Altitude adjustment : <br />Job efficiency factor : <br />Net job correction : <br />Total fleet cost/hour : <br />Selected estimating method : Area <br />$171.55 <br />NA BCY <br />16,133 BCY or CCY <br />Job Condition Correction Factors - <br />Unadjusted production <br />per selected method : 1,312.35 cu. yds. /hour <br />7,200 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Adjusted unit production : 1,089.25 cu. yds. /hour <br />Adjusted fleet production : <br />1,089.25 cu. yds. /hour <br />Total job time : 14.81 hours <br />Total job cost : <br />$2,541 <br />