My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-12_GENERAL DOCUMENTS - M2005080
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2005080
>
2010-07-12_GENERAL DOCUMENTS - M2005080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:15:34 PM
Creation date
7/18/2011 10:50:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005080
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/12/2010
Doc Name
Conditional Use Permit (CUP) Appl., Temporary Asphalt Batch Plant.
From
Allen Drilling & Excavating
To
Park County and DRMS
Permit Index Doc Type
General Correspondence
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conflict of regulatory requirements may be in need of amendments. If <br />COOT requires their contractor to perform in less than 90 days, how will <br />Park County handle this situation? <br />ASPHALT OPERATION HOURS / OPERATING TIME FRAME: <br />The current business hours will remain the same. The plant will be <br />available for operations from 7 AM — 5 PM, Monday -- Friday. The months <br />of operation will generally be from April — October of each year. Weather <br />conditions may alter that proposed operation time frame, but not longer <br />than what is proposed. In the case of an emergency situation, we <br />respectfully request to be able to respond on a non -week day, if warranted. <br />This exception is also stated in the approved concrete batch plant <br />conditional use permit. <br />TEMPORARY ASPHALT PLANT / SCHEMATICS: <br />We have provided a sketch plan of a typical temporary asphalt plant for <br />your review. This has been provided by the Planning Department staff. We <br />don't have specific information as the type and or manufacturer at this time. <br />However, the plant will only be staged when operating. When it isn't in use, <br />it will be removed, or at a minimum, will be dies - assembled. <br />SITE SCREENING: <br />The existing site has been screened, as required by the original CUP in <br />2006. However, Mr. Allen has continued to place additional earth berms, <br />decorative concrete blocks, trees, and other screening materials around the <br />operations areas. This temporary asphalt plant will be screened within <br />these same structures and devices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.