Laserfiche WebLink
Demand Item <br />Daily Requirement <br />Annual <br />Requirement <br />Source <br />Drinking Water <br />Drinking water for <br />employees <br />- 313 days per <br />year of operation <br />bottled water <br />Sanitary <br />None <br />None <br />portable toilets <br />Dust Control <br />10,000 gallons per day for <br />dust control on roads and <br />plant (rest is wet process) <br />2,600,000 <br />gallons per year <br />wells and /or <br />ground water <br />(dewatering) <br />Aggregate Washing - <br />325,000 tons per year <br />produced <br />- 400,000 gallons per day <br />104,000,000 <br />gallons per year <br />wells and /or <br />ground water <br />(dewatering) <br />Augmentation Water <br />N/A <br />- 37 -55 acre -feet <br />first 2 years <br />Pueblo Board of <br />Water Works <br />Lease <br />Table G -1: Water Demand <br />St. Barbara Sand and Gravel Mine <br />Pete Lien & Sons, Inc. 20 <br />Paul Banks and Associates, LLC <br />Wetlands <br />The U.S. Army Corps of Engineers has documented through a field inspection, that there <br />are no wetlands on the property other than immediately adjacent to the river bank within <br />the permit boundary. Wetlands adjacent to the river will be protected by the 300 foot <br />river set back. <br />10031 <br />June 15, 2011 <br />