Schwartzwalder Mine 2 6 July 2011 <br />TR -18 Adequacy Review - Revised File No. M- 1977 -300 <br />5) Describe how data collection efforts in the alluvium will be affected and modified during times that <br />Ralston Creek flow exceeds the design criteria of 100 cfs. <br />6) Indicate which remaining characterization and mitigation/cleanup activities mentioned in Section 3.1 will <br />be done under TR -18 or a future TR. If under TR -18, provide a revised detailed plan and schedule for the <br />activities and deliverables. <br />7) Indicate whether characterization and investigation of the mineral loading contribution from the waste <br />rock dumps will be part of the program to be carried out under TR -18 or a future TR. If under TR -18, <br />provide a detailed plan and schedule for the activities and deliverables. If the activities will occur under TR- <br />18, provide a plan for augmentation of the existing monitoring system that will allow characterization of <br />mineral loading contributions from the waste rock dumps to the shallow ground water and to surface water. <br />8) Provide an estimate of the volume of earth that will have to be excavated to allow room for installation of <br />the cutoff walls. Provide details on what will be done with the earth removed, and whether it will be <br />returned to its place of origin upon reclamation, and if not returned to its place of origin, how it will be <br />reclaimed and stabilized for the post- mining time frame. <br />9) Provide locations, dimensions (length, height, width), and detailed designs of the cutoff walls. <br />10) The possibility of accelerated dewatering to expedite installation of diversion structures was discussed on <br />site. Provide details of number, location, depth, and construction details of dewatering wells or other means <br />proposed. Commit to providing well completion diagrams to the Division within a reasonable time <br />following well installation. <br />11) Indicate how and when the 4,000 ft long pipe, the cutoff wall, and any other concrete or steel structures <br />other will be removed at the conclusion of the project. <br />12) Understanding that possible irrigation requirements are not yet finalized, please provide the anticipated <br />rates of irrigation water application and anticipated time periods of application. <br />13) Provide the anticipated time duration of the post - operational biological monitoring period, presented in <br />Section 3.2, for stream habitat restoration. <br />14) The Operator must commit to installing some type of metering or other means with which to measure the <br />flow entering or exiting the pipe. The operator will commit to measuring flow weekly until further notice. <br />15) The Operator must commit to monitoring ground water levels in all monitoring wells on at most a <br />monthly basis until notified otherwise by the Division. Water quality sampling may continue on a quarterly <br />basis. <br />16) Describe the procedure that would be followed if the pipe should need repair or maintenance after it has <br />been installed and is in service. <br />17) The Division requires more details for the purpose of verifying /calculating the financial warranty. Please <br />provide the following: <br />