Laserfiche WebLink
ACCEPTABLE SUCCESS CRITERIA. SUCH CRITERIA MUST BE FORMULATED AND <br />AGREED TO NO LATER THAN JANUARY 1, 1982. SECTION F ON PAGE V -51A SHALL <br />BE REVISED ACCORDINGLY. WITH RESPECT TO THE USE OF REFERENCE AREAS <br />AND RANGE SITE DESCRIPTION IN DETERMINATION OF REVEGETATION <br />SUCCESS, THE PROCEDURES OUTLINED IN COMMENT 5 OF THE APRIL 20, 1981 <br />LETTER TO WESTERN FUELS ARE TO BE FOLLOWED. <br />Status: This stipulation was satisfied and terminated on 01 January 1982. <br />Stipulation No. 20: WESTERN FUELS MUST SUBMIT, FOR THE REGULATORY <br />AUTHORITY APPROVAL, A DETAILED SAMPLING PLAN INCORPORATING THE <br />REQUESTED CHANGES IN PLOT SIZE AND TRANSECT DESIGN. THIS PLAN MUST <br />BE SUBMITTED PRIOR TO THE COMMENCEMENT OF SAMPLING FOR 1981. <br />Status: This stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 21: ATRIPLEX CONFERTIFOLIA MUST BE REMOVED FROM THE <br />PROPOSED SEEDMIXES AND REPLACED BY ATRIPLEX CANESCENS. IN ADDITION, <br />COLORADO WILDRYE WILL BE SUBSTITUTED FOR BLUEBUNCH WHEATGRASS. <br />THE REVISED SEEDMIXES MUST BE SUPPLIED TO THE REGULATORY AUTHORITY <br />WITHIN 30 DAYS OF APPROVAL. <br />Status: This stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 22: WITHIN 30 DAYS AFTER THE PERMIT HAS BEEN GRANTED, THE <br />APPLICANT MUST PROVIDE THE FOLLOWING INFORMATION TO THE <br />REGULATORY AUTHORITY: SPECIFICATIONS AND CALCULATIONS SHOWING <br />THAT DITCHES ALONG THE IMPROVED SECTION OF COUNTY RD 65, THE MINOR <br />ACCESS ROAD, AND THE CONVEYOR MAINTENANCE RD HAVE BEEN DESIGNED <br />TO WITHSTAND THE 10 -YEAR, 24 -HOUR STORM EVENT. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 23: THE APPLICANT SHALL OBTAIN RIGHTS -OF -WAY FROM BLM <br />PRIOR TO THE CONSTRUCTION OF OFF LEASE ROADS, TRANSMISSION LINES, <br />WATER LINES AND FACILITIES AND FOR THIRD PARTY FACILITIES ON THE <br />LEASES. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 24: COMPANY HAS NOT SUBMITTED ADEQUATE INFORMATION ON <br />MULE DEER AND ANTELOPE MIGRATION PROBLEMS THROUGH THE AREA OF <br />DISTURBANCE. IN ORDER TO DEVELOP PROPER MITIGATION PLANS FOR THE <br />PROTECTION OF THE INTEGRITY OF MIGRATION ROUTES BRIEFLY IDENTIFIED IN <br />BLM'S FINAL EIS ON THE MOON LAKE PROJECT, THE FOLLOWING STIPULATION <br />HAS BEEN DEVELOPED: THE APPLICANT MUST SUBMIT TO THE REGULATORY <br />AUTHORITY THE COMPLETE STUDY RESULTS FOR MULE DEER AND ANTELOPE <br />Deserado Mine Permit Revision 07 <br />C- 1981 -018 9 29 June 2011 <br />