Laserfiche WebLink
MIGRATION CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 25: DUE TO POOR WEATHER CONDITIONS, THE APPLICANT'S <br />SURVEY FOR SAGE GROUSE LEK ACTIVITIES WERE UNSUCCESSFUL. A SURVEY <br />IS BEING CONDUCTED IN SPRING OF 1981 TO DETERMINE IF ANY LEKS DO OCCUR <br />IN THE AREA TO BE DISTURBED. THEREFORE, BEFORE ANY EVALUATION CAN <br />BE INITIATED, THAT SURVEY MUST BE SUBMITTED. WITHIN 30 DAYS OF THE <br />MINE PLAN APPROVAL, THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY THE RESULTS OF THE LEK SURVEY AND WHAT MITIGATION <br />PROCEDURES WILL BE USED TO MINIMIZE IMPACTS TO SAGE GROUSE AND <br />THEIR HABITATS. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 26: ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE NESTS <br />ADJACENT TO THE MINING SITE MUST BE PROVIDED. THEREFORE, THE <br />FOLLOWING DESCRIBED LANDS ARE CLASSIFIED AS UNSUITABLE FOR SURFACE <br />DISTURBANCE AND OCCUPANCY. PERIODIC ACTIVITY DURING THE NON - <br />NESTING SEASON (JUNE 1 - FEBRUARY 28) WITHIN THE BUFFER ZONE CAN BE <br />APPROVED ON A CASE BY CASE BASIS: FEDERAL LEASE D- 047201, T2N, R10W, <br />6TH PM, SEC. 3, S 1/2 SE1 /4, SEC. 10, NE 1/4 NE 1/4; FEDERAL LEASE C- 02373, T2N, <br />RiOW, 6TH PM SEC. 3, E 1/2 SE /4 SW 1/4. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 27: UPON APPROVAL OF DEPARTMENTAL ACTION, THE OPERATOR <br />WILL SUBMIT WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES <br />USING APPROVED GUIDELINES FOR RAPTOR PROTECTION. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 28: UPON APPROVAL OF DEPARTMENTAL ACTION, THE OPERATOR <br />WILL COMMIT WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS <br />APPROVED BY THE REGULATORY AUTHORITY AND TO FENCE ANY PONDS THAT <br />CONTAIN TOXIC MATERIALS. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 29: A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE <br />CONSTRUCTION AND OPERATION CAN BEGIN. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 30: WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE <br />PLAN, THE APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE <br />Deserado Mine Permit Revision 07 <br />C- 1981 -018 10 29 June 2011 <br />