Laserfiche WebLink
Stipulation No. 15: WITHIN 30 DAYS OF PERMIT APPROVAL, THE APPLICANT SHALL <br />COMMIT TO THE REGULATORY AUTHORITY TO COMPLY WITH THE FOLLOWING <br />REQUIREMENTS: TO IMPLEMENT SEDIMENT CONTROL MEASURES PRIOR TO THE <br />ONSET OF CONSTRUCTION OF THE COAL TRANSPORT AND STORAGE AREA; TO <br />PROVIDE EMERGENCY AND PRINCIPAL SPILLWAY OUTLETS WITH APPROPRIATE <br />EROSION CONTROL PRIOR TO THE CONSTRUCTION OF SEDIMENT PONDS; TO <br />PROVIDE BAFFLES ON EACH OF THE REFUSE DISPOSAL AREA SEDIMENT PONDS <br />AS NECESSARY. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 16: WITH RESPECT TO VEGETATION RESAMPLING IN THE 1981 FIELD <br />SEASON, SITE 50 (COLORADO WILDRYE) AND ITS REFERENCE AREA WILL BE <br />SAMPLED FOR HERBACEOUS COVER AND PRODUCTION. SITE 60 (JUNIPER) WILL <br />BE SAMPLED FOR SHRUB DENSITY AND FOR PRODUCTION. SITE 41 (SAGEBRUSH - <br />GRASS) AND SITE 40 (GREASEWOOD- SAGEBRUSH) AND CORRESPONDING <br />REFERENCE SITES WILL BE SAMPLED FOR PRODUCTION. DATA SUMMARIES AND <br />STATISTICAL ANALYSES MUST BE SUMITTED TO THE REGULATORY AUTHORITY <br />BY OCTOBER 1, 1985. THIS SHALL APPLY FOR ALL SAMPLING CONDUCTED <br />DURING 1981. <br />Status: This stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 17: WITH RESPECT TO VEGETATION SAMPLING DURING THE 1981 <br />FIELD SEASON IN AREAS TO BE DISTURBED BY REFUSE DISPOSAL UNITS 1 -4, THE <br />NUMBER OF SAMPLE CLUSTERS WITHIN EACH VEGETATION TYPE SHALL BE AS <br />SPECIFIED ON PAGE 24 -7 OR ILLUSTRATION PARAMETERS. THE SIZE AND <br />LOCATION OF PROPOSED REFERENCE SITES MUST BE SUBMITTED TO THE <br />REGULATORY AUTHORITY WITHIN 30 DAYS OF APPROVAL. THE REFERENCE <br />AREA WHICH WILL REPRESENT THE AREA PRESENTLY OCCUPIED BY THE <br />CHEATGRASS - ANNUAL FORB COMMUNITY MUST BE SPECIFIED. <br />Status: This stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 18: DISTURBED ACREAGES OF EACH VEGETATION TYPE AFFECTED <br />BY THE SITES MENTIONED ON PAGE 24 -8 SHALL BE CALCULATED AND <br />SUBMITTED TO THE REGULATORY AUTHORITY WITHIN 30 DAYS OF APPROVAL. <br />THE NUMBER OF SAMPLE CLUSTERS REQUIRED WILL BE SET BY THE <br />REGULATORY AUTHORITY AT THAT TIME. A MAP INDICATING THE SIZE AND <br />LOCATION OF PROPOSED REFERENCE SITES SHALL ALSO BE SUBMITTED BY THE <br />ABOVE DEADLINE. <br />Status: This stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 19: WITH RESPECT TO EVALUATION OF SPECIES DIVERSITY ON <br />RECLAIMED LANDS,WESTERN FUELS IS REQUIRED TO WORK WITH THE <br />REGULATORY AUTHORITY TOWARDS THE ESTABLISHMENT OF MUTUALLY <br />Deserado Mine Permit Revision 07 <br />C- 1981 -018 8 29 June 2011 <br />