Stipulation No. 10: THE APPLICANT SHALL PROVIDE THE REGULATORY AUTHORITY <br />WITH A CORRECTED VERSION OF MAP 77, REFUSE DISPOSAL AREA SITE <br />PREPARATION, WHICH SHOWS THE LOCATION OF THE CULVERT THAT CARRIES <br />FLOW FROM THE NON -TOXIC FILL STOCKPILE DITCH ACROSS THE HAUL ROAD <br />INTO THE SUBAREA R2 -3 SEDIMENT POND. THIS INFORMATION SHOULD BE <br />SUBMITTED WITHIN 90 DAYS OF APPROVAL OF THE MINE PLAN PERMIT. <br />Status: This stipulation was satisfied and terminated on 27 October 1981. <br />Stipulation No. 11: WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE <br />APPLICANT SHALL PROVIDE DITCH DIMENSIONS FOR THE ENTIRE "NORTH <br />TOPSOIL DITCH" IN THE D- PORTAL AREA. THESE PLANS MUST BE SUBMITTED <br />AND APPROVED PRIOR TO THE ONSET OF CONSTRUCTION AT THE D- PORTAL <br />AREA. <br />Status: This stipulation was satisfied and terminated on 27 September 1981. <br />Stipulation No. 12: WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE <br />APPLICANT MUST SUBMIT THE CALCULATIONS AND ASSUMPTIONS USED TO <br />SIZE THE RAILROAD LOOP SEDIMENTATION PONDS, AND MUST RESIZE THE <br />OUTLET CULVERT IN SEDIMENTATION POND NO. 4 IN THE RAILROAD LOOP TO <br />PREVENT EXCESSIVE PONDING AT THE ENTRANCE OR JUSTIFY THE PRESENT <br />SIZING WITH APPROPRIATE CALCULATIONS. THE LOWER SEGMENT OF THE <br />SUBAREA R4 REFUSE DITCH MUST ALSO BE RESIZED TO ACCOMMODATE THE 10 <br />YEAR -24 HOUR FLOW. <br />Status: This stipulation was satisfied and terminated on 27 September 1981. <br />Stipulation No. 13: THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY WITHIN 90 DAYS A MODIFIED RESTORATION PLAN FOR SCULLION <br />GULCH TO OMIT THE 13 PROPOSED IN- CHANNEL ROCK CHECK DAMS. IN LIEU OF <br />THESE, THE APPLICANT SHALL INSTALL 3 DAMS OF SEDIMENT TRAPS, BUILT TO <br />SCS OR US FOREST SERVICE SPECIFICATIONS, AT THE DOWNSTREAM <br />CONSTRUCTION LIMITS IN SCULLION GULCH. THESE TRAPS SHOULD PROVIDE <br />SUFFICIENT STORAGE TO STORE ONE YEAR OF SEDIMENT ACCUMULATION <br />FROM D- PORTAL AREA. <br />Status: This stipulation was satisfied and terminated on 27 October 1981. <br />Stipulation No. 14: THE APPLICANT MUST PROVIDE THE REGULATORY <br />AUTHORITIES WITH PLANS TO RESIZE THE D- PORTAL AREA AND -1 PRINCIPAL <br />SPILLWAY TO ALLOW A MAXIMUM HEAD OF ONLY ONE FOOT ABOVE THE RISER <br />CREST OF PROVIDE ADDITIONAL FREEBOARD BETWEEN THE RISER CREST AND <br />EMERGENCY SPILLWAY CREST. THE REVISED PLAN SHOULD BE SUBMITTED <br />WITHIN 90 DAYS OF PERMIT APPROVAL. <br />Status: This stipulation was satisfied and terminated on 27 October 1981. <br />Deserado Mine Permit Revision 07 <br />C- 1981 -018 7 29 June 2011 <br />