Laserfiche WebLink
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E Cresson Clay Processing <br />9,180 <br />134,468 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />9,180 <br />366,872 <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />Dump 4 LVSCF Processing <br />22,162 <br />367,027 <br />• <br />ame0 <br />Earth 8 Environmental <br />H) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT D -8 dozer, a CAT 320 excavator, a <br />CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, and <br />process the material. <br />2) Low Volume Solution Collection Fill Material (LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />1) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. Storm water controls are being observed in the East Cresson Clay Borrow. <br />VLF Weekly Report WE 06.05.10.D <br />