My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-06-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
6/28/2011 10:09:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/27/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 6/5/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />121,223 <br />Total <br />0 <br />121,223 <br />D) Soil Liner Fill <br />1) VLF <br />Soil liner fill (SLF) placement continued in the areas shown on Figure 2. Subgrade was <br />approved and moisturized prior to placement using a tandem -axle water truck. The SLF <br />material was moisture conditioned at the temporary stockpile and loaded into 40 -ton <br />articulating haul trucks using a John Deere 744 front -end loader. Placement was performed <br />using a CAT D -8 LGP dozer, two CAT D -6 LGP dozers, and a skid steer loader in a one -foot <br />compacted lift. Moisture conditioning of SLF material was performed using a tandem -axle <br />water truck and compaction was achieved using a 10 -ton vibratory smooth drum compactor. <br />Nuclear density testing, moisture verification, and depth check testing was performed with <br />results within project specifications. Test locations were surveyed by Ames. <br />E) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />No placement performed during the week. <br />2) Drain Cover Fill (DCF) <br />No work performed during the week. <br />F) Leak Detection Trench <br />1) VLF <br />No work performed during the week. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />ame <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF resumed performing deployment, and <br />seaming. Geomembrane installation was performed in the area shown in Figure 3. <br />Approximately 193,381 square feet of 80mi1 LLDPE was deployed using a John Deere 200 <br />excavator and a John Deere 544 front -end loader with spreader -bar attachments. Subgrade was <br />inspected and approved by AMEC and Lonestar representatives prior to geomembrane <br />deployment (see Figure 3). Approximately 9,119 linear feet of seam was fusion welded using <br />one fusion welding machine. Twenty destructive test samples were marked during fusion <br />VLF Weekly Report WE 06.11.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.