My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-06-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
6/28/2011 10:09:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/27/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 6/5/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />ame <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 11, 2011 <br />Reporting Period: 6/5/11 through 6/11/11 <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 41 °F to 53 ° F ( + / -) High: 68 °F to 80 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: Lonestar arrived onsite Monday (6/6/2011). Training and filling of sand bags was <br />performed 6/6/2011 through 6/8/2011. Geomembrane installation resumed Thursday (6/9/2011). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade acceptance was not performed during the week. Previous subgrade acceptance is <br />shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed between stations J0 +00 ( + / -) and J12+00 ( + / -), approximately 600 <br />feet left of centerline to 300 feet right of centerline and between stations H0 +00 ( + / -) and <br />HI 1 +00 ( + / -), approximately 100 feet left of centerline to 400 feet right of centerline using two <br />CAT D -6 LGP dozers and two CAT D -8 dozers. The subgrade surface was moisture <br />conditioned using a tandem -axle water truck (when necessary) and compacted with at least 4- <br />passes using a CAT 563 vibratory smooth drum compactor. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 06.11.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.