My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-14_REVISION - M1977098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977098
>
2011-06-14_REVISION - M1977098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:46:01 AM
Creation date
6/27/2011 8:15:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977098
IBM Index Class Name
Revision
Doc Date
6/14/2011
Doc Name
Notice of surety increase SI-04
From
DRMS
To
Lafarge West, Inc.
Type & Sequence
SI4
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 003 Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 5.50 LCY (heaped) <br />Bucket Fill Factor: 0.900 Other - cemented materials (85 - 95 %) 0.900 <br />Adjusted Capacity: 4.95 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6020 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />0.92 <br />0.83 <br />0.76 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 3.5083 minutes <br />Total Cycle Time: 4.0433 minutes <br />Unadjusted Hourly Unit Production: 73.45 LCY /Hour <br />Adjusted Hourly Unit Production: 56.09 LCY/Hour <br />Adjusted Hourly Fleet Production: 112.18 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 6.33 Hours <br />Unit cost: $2.084 /LCY Total job cost: $1,480.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.