My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-14_REVISION - M1977098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977098
>
2011-06-14_REVISION - M1977098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:46:01 AM
Creation date
6/27/2011 8:15:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977098
IBM Index Class Name
Revision
Doc Date
6/14/2011
Doc Name
Notice of surety increase SI-04
From
DRMS
To
Lafarge West, Inc.
Type & Sequence
SI4
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material 6" and over diameter 0.03 <br />0.030 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Task description: Removal/haulage of asphalt to excavated pit <br />Site: Sievers Pit <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 6/14/2011 County: Garfield <br />User: , DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 972G (2002) <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />MATERIAL QUANTITIES <br />Initial volume: 710 <br />Loose volume: <br />Haul and Return Time <br />Haul Route: <br />Return Route: <br />Length <br />(feet) <br />710 <br />Permit Action: <br />$27.23 <br />$51.19 <br />$38.49 <br />$116.91 <br />Total Fleet Cost/Hour: $233.81 <br />Grade Res. <br />( %) <br />June 9, 2011 <br />Inspection <br />Utilization % <br />NA <br />100 <br />NA <br />CCY Swell factor: 1.000 <br />LCY <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Abbreviation: None <br />Horsepower: 265 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Travel Time <br />(minutes) <br />Page 1 of 2 <br />Permit/Job #: M1977098 <br />Filename: M098 -003 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): 0.575 minutes <br />Net Cycle 'Time Adjustment: -u. <br />Adjusted Basic Cycle Time: 0.535 minutes <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Return: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />2000 <br />2000 <br />0.00 <br />0.00 <br />5.00 <br />5.00 <br />5.00 <br />5.00 <br />1.8443 <br />1.6640 <br />Source <br />(Cat HB) <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.