My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-14_REVISION - M1977098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977098
>
2011-06-14_REVISION - M1977098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:46:01 AM
Creation date
6/27/2011 8:15:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977098
IBM Index Class Name
Revision
Doc Date
6/14/2011
Doc Name
Notice of surety increase SI-04
From
DRMS
To
Lafarge West, Inc.
Type & Sequence
SI4
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Highwall reduction <br />Permit Action: June 9, 2011 <br />Inspection <br />Site: Sievers Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />004 State: Colorado <br />6/14/2011 County: Garfield <br />DMC <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Cat D8R Series II - 8U (2005) <br />310 <br />Universal <br />NA <br />8,333 <br />1.124 <br />9,363 LCY <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />Source of estimated swell factor: Cat Handbook <br />50 feet <br />1,627.0 LCY /hr <br />Average push gradient: -15 % <br />Average site altitude: 6,020 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Sand and gravel - Dry <br />BULLDOZER WORK <br />Source of estimated volume: Division of Reclamation, Mining & Safety Inspection <br />Compacted fill or embankment 0.9 <br />0.750 <br />0.900 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB)) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M 1977098 <br />Filename: M098 -004 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.