My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_REVISION - M1986002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2011-06-20_REVISION - M1986002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/27/2011 8:15:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
REVISION
Doc Date
6/20/2011
Doc Name
Conditions for approval (CN-01)
From
United Companies
To
DWR
Type & Sequence
CN1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION FOR UNDERGROUND WATER RIGHTS, <br />CHANGE OF WATER RIGHTS, AND REQUEST FOR <br />APPROVAL OF PLAN FOR AUGMENTATION <br />Page 9of12 <br />located at a point on the right abutment being the <br />intersection of the center line of the axis of the dam and of <br />the center line of the outlet works tunnel, whence the SW <br />corner of section 31, T49N, R4W, NMPM bears North <br />78 °36'44" West a distance of 3,207.07 feet. <br />d. Source: Gunnison River <br />e. Appropriation date: November 11, 1957 <br />f. Amount: 1,063,457 acre feet <br />g. Decreed use: domestic, municipal, irrigation, <br />stockwatering, industrial, hydropower, piscatorial, wildlife, <br />recreation and other purposes. <br />D. Statement of plan for augmentation: <br />i) Potential downstream calling rights: The water rights involved in <br />this Application are tributary to the lower Gunnison River. The <br />only senior downstream calling rights are held by the Redlands <br />Power and Water Company. They hold three separately decreed <br />rights: <br />a. 670 c.f s. absolute decreed in Case No. CA1927 with a July <br />31, 1905 appropriation date and a July 22, 1912 <br />adjudication date. ( "Senior Redlands Right ") <br />b. 80 c.f.s. absolute decreed in Case No. CA8303 with a June <br />26, 1941 appropriation date and a July 21, 1959 <br />adjudication date. (Together with the 100 c.f.s. right <br />below, "Junior Redlands Rights "). <br />c. 100 c.f.s. absolute decreed in Case No. 94CW0228 with an <br />October 1, 1994 appropriation date and a December 31, <br />1994 adjudication date. (Together with the 80 c.f.s. right <br />above, "Junior Redlands Rights "). <br />ii) Potential call period: In order to determine potential out -of- <br />priority depletions under this plan for augmentation, Applicant <br />considered the potential call periods for both the Senior Redlands <br />Right and the Junior Redlands Rights during the extreme drought <br />conditions that existed in 2002 -2003. The number of call days per <br />month based on that analysis is outlined in the attached Exhibit 9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.