Laserfiche WebLink
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.095 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.6544 <br />Adjusted unit production: 1,047.04 LCY /hr <br />Adjusted fleet production: 2094.08 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />2 Dozer(s) <br />$0.190 /LCY <br />64.93 Hours <br />$25,787.51 <br />Task # 001 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />