My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-16_REVISION - M1976051 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976051
>
2011-06-16_REVISION - M1976051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:58 PM
Creation date
6/23/2011 7:56:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976051
IBM Index Class Name
REVISION
Doc Date
6/16/2011
Doc Name
Amendment approval (AM-05)
From
DRMS
To
Duckels Construction, Co.
Type & Sequence
AM5
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material up to 1/8" diameter 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Task description: <br />Site: Bettger Gravel Pit <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 3/10/2011 <br />User: DMC <br />Cost Breakdown: <br />Agency or organization name' DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Attachment 1: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $233.81 <br />MATERIAL QUANTITIES <br />Initial volume: 5,378 CCY <br />Loose volume: 5,378 LCY <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Haul and Return Time <br />Haul Route: <br />Return Route: <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Transport topsoil from stockpile to dozer <br />CAT 972G (2002) <br />ROPS Cab <br />Permit Action: AM5 Permit/Job #: M1976051 <br />State: Colorado <br />County: Routt <br />$27.23 <br />$51.19 <br />$38.49 <br />$116.91 <br />Utilization % <br />NA <br />100 <br />NA <br />Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Return: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Length <br />(feet) <br />Grade Res. <br />( %) <br />Rolling <br />Res. ( %) <br />Horsepower: 265 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Res. <br />( %) <br />Abbreviation: None <br />Filename M051 -002 <br />-0.050 <br />Adjusted Basic Cycle Time: 0.525 <br />0.575 <br />Travel Time <br />(minutes) <br />Page 1 of 2 <br />minutes <br />minutes <br />minutes <br />300 <br />300 <br />0.00 <br />0.00 <br />5.00 <br />5.00 <br />5.00 <br />5.00 <br />0.2766 <br />0.2496 <br />Source <br />(Cat HB) <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.