Laserfiche WebLink
Task description: <br />Site: Bettger Gravel Pit <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9U (2005) <br />Horsepower: 405 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $397.14 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />110,550 <br />1.230 <br />135,977 LCY <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />BULLDOZER WORK <br />Backfill cut (4 acres, 15' depth), + 3H:1V (1100' x 15') <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 3/10/2011 County: Routt Filename: M051 -001 <br />User: DMC <br />Agency or organization name' DRMS <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />0% <br />6,750 feet <br />Earth - Loam <br />$49.19 <br />$110.89 <br />$0.00 <br />$38.49 <br />75 feet <br />1,600.0 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />2,100 lbs /LCY <br />Permit Action: AM5 Permit/Job #: M1976051 <br />0.750 <br />1.200 <br />1.000 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />