Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Backfill cut (4 acres, 15' depth), + 3H:1 V (1100' x <br />15') <br />DOZER <br />N N N ,--i ^-, <br />64.93 <br />$25,787.51 <br />$2,690.00 <br />$776.72 <br />$5,516.00 <br />$4,501.38 <br />Transport topsoil from stockpile to dozer <br />LOADER <br />11.50 <br />Topsoil application (4 acres, 10" depth) <br />DOZER <br />1.96 <br />Revegate disturbed area <br />REVEGE <br />40.00 <br />Mobilize reclamation crew /equipment <br />MOBILIZE <br />2.68 <br />SUBTOTALS: <br />121.07 <br />$39,271.61 <br />Task description: <br />Site: Bettger Gravel Pit <br />AM5 Bond review <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/10/2011 County: Routt <br />User: DMC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY WORK <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />Permit Action: AM5 Permit/Job #: M1976051 <br />Abbreviation: None <br />Filename: M051 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $793.29 <br />Performance bond: 1.05 Total = $412.35 <br />Job superintendent: 56.50 Total = $3,308.64 <br />Profit: 0.00 Total = $0.00 <br />TOTAL O & P = $4,514.28 <br />CONTRACT AMOUNT (direct + 0 & P) = $43,785.89 <br />Total = <br />Total = <br />500.00 <br />$0.00 <br />$2,189.29 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $7,203.57 <br />TOTAL BOND AMOUNT (direct + indirect) = $46,4754 <br />