My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-16_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-06-16_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
6/16/2011 2:09:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/16/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 5/29/11.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameca <br />B) Geomembrane Exposure <br />1) VLF <br />Previously installed geomembrane was exposed using a John Deere 35D excavator and <br />laborers between stations H13+00 (+/-) and H23+00 (+/-). The geomembrane was exposed to <br />allow for new geomembrane to be tied in and was observed by an AMEC field representative. <br />C) Anchor Trench <br />1) VLF <br />Excavation of the existing anchor trench was performed between stations H23+00 (+/-) and <br />H32+00 (+/-) was performed to allow for soil liner fill (SLF) placement in the area. This was <br />performed using a John Deere 35D and laborers. An AMEC field representative observed the <br />anchor trench excavation constantly. The full depth of the anchor trench was excavated were <br />saturated SLF was encountered. <br />Anchor trench backfill was performed between stations H24+00 (+/-) and H29+00 (+/-) using a <br />John Deere excavator, a vibratory plate compactor, two jumping jack compactors, and laborers. <br />This was performed to replace any saturated SLF removed from the trench. An AMEC field <br />representative observed the backfill and it was found to be performed in accordance with <br />design drawings and project specifications. <br />D) Geomembrane Acceptance <br />1) VLF <br />No geomembrane was deployed or accepted during the week. <br />E) Geomembrane Delivery <br />1) VLF <br />No geomembrane delivered during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed slope contouring within the Phase 5 VLF. <br />AMEC observed compaction of subgrade. <br />AMEC inspected and approved subgrade prior to SLF placement. <br />AMEC observed and assisted in the placement of SLF material. <br />AMEC observed the exposure of previously installed geomembrane. <br />AMEC observed the excavation and backfill of the existing (temporary) Phase 5 anchor trench. <br />VLF Weekly Report WE 06.04.2011
The URL can be used to link to this page
Your browser does not support the video tag.