Laserfiche WebLink
amec* <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue receiving geomembrane to site. <br />Continue geomembrane exposure. <br />Continue subgrade acceptance prior to soil liner fill placement. <br />Continue soil liner fill placement. <br />Continue excavation and backfill of the existing (temporary) Phase 5 anchor trench. <br />Resume geomembrane installation <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />None <br />Ames Construction: <br />None <br />AMEC. <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />June 4, 2011. <br />Joseph D. Hickey, CQA Monitor Date: June 4, 2011 <br />Approved By: <br />Date: <br />VLF Weekly Report WE 06.04.2011 <br />