My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-06-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
6/13/2011 8:26:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/13/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Wk. of 5/22/11.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'O <br />D) Soil Liner Fill <br />1) VLF <br />No work performed during the week. <br />E) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />No placement performed during the week. <br />2) Drain Cover Fill (DCF) <br />No work performed during the week. <br />F) Leak Detection Trench <br />1) VLF <br />Construction of the leak detection trench continued with the placement of soil liner fill (SLF) <br />over the previously constructed trench between stations Hl 1+00 (+/-) and H20+00 (+/-). SLF <br />material was placed in the trench, moisture conditioned using a tandem axle water truck (when <br />necessary), and compacted using a vibratory plate compactor. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />DCF Process 0 121,223 <br />Total 0 121,223 <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />No work performed during the week. <br />B) Geomembrane Exposure <br />1) VLF <br />Previously installed geomembrane was exposed using a John Deere 35D excavator and <br />laborers between stations E3+00 (+/-) and E9+00 (+/-). The geomembrane was exposed to <br />allow for new geomembrane to be tied in and was observed by an AMEC field representative. <br />VLF Weekly Report WE 05.28.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.