My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-06-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
6/13/2011 8:26:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/13/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Wk. of 5/22/11.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*, <br />amec'0 <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: May 28, 2011 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 5/22/11 through 5/28/11 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 34°F to 43°F (+/-) High: 57°F to 65°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Work activities were paused at the end of shift in observance of the Memorial Day holiday. Work <br />activities are scheduled to resume Wednesday (6/1/2011). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />A CAT 563 vibratory smooth drum compactor was used to compact subgrade between stations <br />J4+00 (+/-) and J22+00 (+/-). The subgrade surface was moisture conditioned (when <br />necessary) and compacted with at least 4-passes. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed between stations J0+00 (+/-) and J28+00 (+/-), approximately 600 <br />feet left of centerline to 300 feet right of centerline and between stations H6+00 (+/-) and <br />Hl 1+00 (+/-), approximately 0 to 300 feet left and right of centerline using two CAT D-6 LGP <br />dozers and two CAT D-8 dozers. Excess material from slope contouring was loaded into 40- <br />ton articulating haul trucks using a CAT 312 excavator and was hauled to an area designated <br />by CC&V. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 05.28.2011
The URL can be used to link to this page
Your browser does not support the video tag.