amec'O <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />Location This Week Cumulative Comments <br /> (tons) tons <br />DCF Process 0 121,223 <br />Total 0 121,223 <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />No work performed during the week. <br />B) Geomembrane Exposure <br />1) VLF <br />Previously installed geomembrane was exposed using a John Deere 35D excavator and <br />laborers between stations E2+00 (+/-) and E4+00 (+/-). The geomembrane was exposed to <br />allow for new geomembrane to be tied in and was observed by an AMEC field representative. <br />C) Anchor Trench <br />1) VLF <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />1) VLF <br />No geomembrane was accepted during the week. <br />E) Geomembrane Delivery <br />1) VLF <br />Three loads (33 rolls) of 80mil LLDPE single sided textured geomembrane rolls were <br />delivered to site during the week. The loads were delivered on a flat bed truck in good <br />condition. The rolls were unloaded using a CAT 950 front-end loader with forks attached. The <br />geomembrane was placed on three pieces of HDPE pipe, stacked two rolls high. An AMEC <br />field representative inventoried the geomembrane and was present at all times during <br />unloading of the geomembrane. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. Ambient and fill temperatures <br />were monitored during fill placement. <br />VLF Weekly Report WE 05.14.2011