amecl* <br />AMEC observed slope contouring within the Phase 5 VLF. <br />AMEC observed compaction of subgrade. <br />AMEC observed the excavation and construction of the leak detection trench. <br />AMEC observed the exposure of previously installed geomembrane. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue structural fill placement within the Phase 5 VLF. <br />Continue receiving geomembrane to site. <br />Continue leak detection trench installation. <br />Continue geomembrane exposure. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Pre-construction meeting on May 10, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Other: <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />VLF Weekly Report WE 05.14.2011