Access Road <br />Debris rack <br />• Install a debris rack as designed for the culvert. The debris rack will be periodically <br />maintained to ensure the inlet is not obstructed; <br />Temporary Sediment Traps/Rock Check Dams <br />• Where necessary, check dams or debris basins will be constructed to minimize surface <br />water erosion to impacted areas (See Attached Guidance Documents for installation <br />guidelines) (Attachment A- Sheet C4.92-CLC Associates); <br />Road Base <br />• Final grading will include a suitable crushed rock road base (-1/2 inch) on the access <br />road placed over a crushed eight inch thick road base. (Attachment A- Sheet C2.00-CLC <br />Associates); <br />Berms/Guard Rails <br />• A berm/guard rails will be constructed on the outside of the road fill; <br />• The berm/guard rails will be at least 1.5 to 2 feet high; <br />• The berm/guard rails will be constructed in accordance with Mining Safety and Health <br />Administration (MSHA) guidelines; <br />• Guard rails will be constructed in accordance with Standard Engineering Practices from <br />Station 18.10 to 19+90. <br />Reclamation Specifications <br />Reclamation on cut and fills consisting of terrace deposits will be graded, revegetated <br />(including trees),(See Seed Mix/Planting program is presented in Attachment B); <br />As appropriate, cut slopes where slopes are steeper than 1(H):1 (V) on unconsolidated <br />materials will be reinforced (Attachment A- Sheet C4.91-CLC Associates). <br />Contingency <br />If the road slumps or partially fails, the failed area will be repaired by backfilling the <br />area with suitable material. If the materials impacts the wetland at the base of the fill, <br />Wildcat will mitigate the impacted area by creating wetland offsets similar to the <br />offsets currently required by the Army Corp of Engineers (Application number SPK- <br />2007-980-CD) where the offsets have been at establishing a 1 to 1 (Impact to <br />Mitigation) area. <br />Implement Monitoring Program <br />• Monument points will be established at 20+20, 20+40, 20+60 and 20+60. <br />(Attachment A- Sheet C3.10-CLC Associates. Following baseline readings, first <br />round of survey measurements will be obtained one week later and quarterly <br />thereafter while road is in use. <br />[Publish Date] <br />