My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (63)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (63)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/7/2011 9:02:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to CN-01 3rd addequacy issues for 112d-1 application part 2 attachment E thru I
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access Road <br />Summary table will be prepared and evaluated, a report will be submitted to DRMS <br />and the following additional reporting will be adopted: <br />o Movement > 0.2 feet between consecutive readings: immediately evaluate <br />cause of movement, take corrective action as necessary, and report to County <br />and DRMS; <br />o Movement > 0.4 feet between consecutive readings: use of road will <br />immediately cease and the cause of movement evaluated, corrective action <br />taken as necessary; and results reported to County and DRMS. <br />Inspection and Maintenance Program <br />On monthly basis: <br />• Remove debris, slash, and trees to a temporary storage area located at 22+40 <br />• All paper, tape, wood lathes etc will be bagged and disposed in an offsite <br />landfill <br />• Inspect retaining wall, roadway for signs of distress <br />• Check for debris in roadway, remove as necessary <br />• Check condition of silt fence at base of slope; remove soil/rock buildup and <br />repair any damage observed as necessary <br />• Visually Check and record cracks in roadway; <br />Reporting: <br />• Prior to work activity obtain photographs of the project site; <br />• Document daily work activities such as: <br />o Environmental engineering construction monitoring records; <br />o Clear area and dispose debris, trash, and paper offsite; <br />o Remove trees, slash and properly store materials in designated areas; <br />• If required, obtain DRMS signatures on daily work sheets; <br />• Prepare and submit "as-built" drawings; <br />• "As built" drawings will be prepared in the third quarter of 2011 where center <br />lines, cuts and fills have been established; <br />• Survey monuments will be placed and located on a base map to monitor road <br />fill stability; <br />• Monthly monitoring reports will be submitted quarterly (unless movement is <br />recorded) to County and DRMS within 10 days of receipt of results from <br />surveyor; and <br />• Corrective action reports, summarizing the results of corrective action taken if <br />allowable movement thresholds exceeded. <br />[Publish Date] <br />9
The URL can be used to link to this page
Your browser does not support the video tag.