My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/7/2011 8:30:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to CN-01 3rd addequacy issues for 112d-1 application part 1 attachment A thru D
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to CN-01 Third Adequacy Issues -June 6, 2011 <br />Response #8 <br />Wildcat Mining is submitting a revised Figure SWMP 2 addressing these issues The <br />revised Figure SWMP-2 is compliant with Rule 6.2.1(2)- A cony of the revised SWMP 2 is <br />provided within Attachment D to this response <br />Adequacy Issue #9 <br />The application for the amended CN-0 1 included the following reclamation maps: <br />• Figure F-1, May Day No. 1 Post Mine Topography <br />• Figure F-3, May Day No. 2 Post Mine Topography <br />• Figure F-4, Pay Day and Idaho Mill Post Mine Topography <br />• Figure F-4A, Pay Day and Idaho Mill Post Mine Topography Ore Stockpile <br />• Figure F-4, May Day No. 3 Post Mine Topography <br />• Figure F-5a, Chief Portal Post Mine Topography <br />The six reclamation maps submitted with the amended application address approximately 41 % of <br />the area addressed by the reclamation plan. Approximately 59% of the area addressed by the <br />reclamation plan is not supported by reclamation maps. Please provide reclamation maps, which <br />satisfy the requirements of Rules 6.2.1(2) and 6.4.6, for the following affected lands: <br />• May Day 1 East - 0.5 acres <br />• Augmentation Pipeline Corridor - 0.4 acres <br />• La Plata Bridge - 0.1 acres <br />• Staging Yard - 1.0 acres <br />• Exploration Roads and Exploration Drill Pads - 15.8 acres <br />• Pre-existing Roads - 9.5 acres <br />• New Access Road - 1.8 acres <br />Response #9 <br />Wildcat Mining is submitting revised maps addressing these issues and complying with <br />Rule 6.2.1(2) and 6.4.6. Copies of the revised reclamation maps are provided within <br />Attachment C to this response <br />Reclamation maps Figures F-1 through F-Sa provides post mine topography for <br />• May Day No. 1 (Fi gure F-1)• <br />• May Day No. 2 (Fig ure F-3), Pay Day and Idaho Mill Ore Stockpile (Figure F-4); <br />Revised <br />6/6/2011 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.