My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/7/2011 8:30:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to CN-01 3rd addequacy issues for 112d-1 application part 1 attachment A thru D
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to CN-01 Third Adequacy Issues - June 6, 2011 <br />3. Grade Pre-existing access roads; <br />4. Install appropriate storm water management structures; <br />5. Excavate the collapsed Portal at May Day #1 level and establish a <br />stable high wall and mine bench at the May Day #1 level; <br />6. Remove soil, rock and minim related debris from the drainage <br />channel of Little Deadwood Gulch at the Chief Portal and May Day <br />#2 level; <br />7. Take corrective measures as necessary to comply with enforcement <br />actions issued by others agencies, with written approval from the <br />Division; and, <br />8. Consolidate and/or remove ore stockpiled on the benches and on the <br />floor of the May Day No. 1 stope (referenced in the order resolving <br />NOV No. MV-2009-035). <br />b. For the Period beginning after the receipt of first quarter ground water <br />testing results to the receipt of second quarter ground water testing results <br />(assuming water quality and testing results are deemed acceptable).- <br />1._ Retrofit and test the mill, limited to the materials described in a.8. <br />above; and, <br />2. Construct, if necessary, the augmentation ponds <br />C. For the Period beginning after the receipt of second quarter ground water <br />testing results, if the same were found to show compliance with all applicable <br />regulations, Wildcat Mining will be permitted to engage in full and complete <br />mining activities which may include, but will not be limited to the following: <br />1. Commission the mill; <br />2. Conduct milling optimization; <br />3. Production at May Day 91 level; <br />4. Exploration; <br />5. Production expansion; and, <br />6. Milling completion and closure <br />Revised <br />6/6/2011 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.