Laserfiche WebLink
DAILY FIELD REPORT <br />Project Loveland Ready Mix Slurry Wall Report No. 25 <br />Location Larimer County, Colorado Date 10 April 2008 <br />Client Compass Environmental, Inc. Page I of 2 <br />Contractor Compass Environmental, Inc. File No. 107021-001 <br />Weather Spring Snow Storm Temperature 50's F <br />1. CONTRACTOR'S ACTIVITIES: <br />Contractor Start Work 0700 hrs__-__ <br />Contractor Stop Work 0700 hrs <br />Top of Backfill Slope at Start 37+70 _ <br />To of Backfill Sloe at Stop 37+70 <br />Toe of Backfill Slope at Start 39+80 <br />Toe of Backfill Slope at Stop 39+80 <br />Last Completed Set at Start 40+20 <br />Last Completed Set at Stop 40+20 <br />Verified Area of Excavated Alluvium and Bedrock (Dail) <br />Total Area Excavated To Date <br />Excavator Type Komatsu PC800 <br />Fresh Slurry Made Yes <br />FIELD REPRESENTATIVE'S ACTIVITIES: <br />Quality Control Number of <br />Samples Location or Batch # Comments <br />Bentonite Slurry - As-Mixed N/A <br />Bentonite Slurry - In Trench N/A <br />Backfill (Slump, Density) N/A <br />Backfill (Gradation) N/A <br />Backfill (Permeability) N/A <br />Verified Clean AM Backfill <br />Slope and Bottom of Key N/A <br />Verified Depth To Bedrock <br />and Key N/A <br />1. No operations on this date due to snow storm. GS and Compass Environmental Inc. onsite at 0700 for check-in. <br />ATTACHMENTS: None <br />Field Representative(s) Time on/off site Total <br />Greg Snyder, 0700/0715 + 2.75 hrs for 3.0 <br />reports <br />Distribution: Jeff Sallas; file <br />C:\107021-001 Ready Mix\107021-000 Loveland Ready Mix Slurry Wall\C. Lyman Henn Inc. <br />Construction\C.4 Field Reports\Daily Reports\DFR's\DFR 080409.doc