My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-08_REVISION - M2006080 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006080
>
2008-10-08_REVISION - M2006080 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:19 PM
Creation date
5/26/2011 8:17:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006080
IBM Index Class Name
REVISION
Doc Date
10/8/2008
Doc Name
Slurry Wall Constr. Rpt.- Pt.2,Compass Daily Field Rpts.
From
Loveland Ready-Mix Concrete
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT <br />Project Loveland Ready Mix Slurry Wall Report No. 25 <br />Location Larimer County, Colorado Date 11 April 2008 <br />Client Compass Environmental, Inc. Page 1 of 2 <br />Contractor Compass Environmental, Inc. File No. 107021-001 <br />Weather Partly Cloudy/ Sunny-Windy Temperature 50's F <br />1. CONTRACTOR'S ACTIVITIES: <br />Contractor Start Work 0700 hrs <br />Contractor Stop Work 1800 hrs <br />Top of Backfill Slope at Start 37+70 i -- i _--- i_ - <br />- <br />To of Backfill Slope at Stop 38+80 <br />Toe of Backfill Slope at Start 39+80 <br />Toe of Backfill Slope at Stop 41+30 <br />Last Completed Set at Start 40+20 <br />Last Completed Set at Stop 41+60 <br />Verified Area of Excavated Alluvium and Bedrock (Daily) 4665 Sq _Ft. <br />Total Area Excavated To Date 43,225 S q. F. <br />Excavator Type Komatsu PC800 <br />Fresh Slurry Made Yes <br />FIELD REPRESENTATIVE'S ACTIVITIES: <br />Quality Control Number of <br />Samples Location or Batch # Comments <br />Bentonite Slurry - As-Mixed 1 39+90 <br />Bentonite Slurry - In Trench 2 40+40,41+00 <br />Backfill (Slump, Density) 2 37+00,37+20 Backfill slump increased to close in cross cut <br />at STA 40+00. <br />Backfill (Gradation) 1 38+00 <br />Backfill (Permeability) -- -- Next Permeability will be taken around 40+00 <br />Verified Clean AM Backfill <br />Slope and Bottom of Key Yes 39+90 through 40+00 Trench cleaned to bottom of key prior to next <br />excavation set. <br />Verified Depth To Bedrock <br />and Key Yes 40+30 to 41+60 <br />1. GS did not observe any collapse of trench between STA 39+00440+30 due to snow storm on 4/10/08. <br />2. Performed quality control testing on slurry and backfill. Observed backfill and excavation operations. Other tests <br />performed yielded results in general accordance with project specifications. Test results were reported to Al of <br />Compass. Prepared Daily Field Report and updated slurry wall data spreadsheet. <br />ATTACHMENTS: None <br />Field Representative(s) Time on/off site Total <br />Greg Snyder 0700/1700 10 <br />Distribution: Jeff Sallas; file <br />C:\107021-001 Ready Mix\107021-000 Loveland Ready Mix Slurry Wall\C. Lyman Henn Inc. <br />Construction\C.4 Field Reports\Daily Reports\DFR's\DFR 080407.doc
The URL can be used to link to this page
Your browser does not support the video tag.