My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-12_PERMIT FILE - M2011028 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011028
>
2011-05-12_PERMIT FILE - M2011028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:28 PM
Creation date
5/12/2011 2:10:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011028
IBM Index Class Name
PERMIT FILE
Doc Date
5/12/2011
Doc Name
New 112c application part 2 exhibit H thru exhibit L
From
Weeminuche Construction Authority
To
DRMS
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The northeastern borrow area limit was established by the Animas <br />Air Park boundary. The south and west limits were established <br />near elevation 6600, which approximates top of bedrock in this <br />area. The northwest boundary was established to include an area <br />that could be used by the contractor as a staging area. <br />The contractor will likely use the existing staging area for <br />aggregate processing and stockpiling. The specifications should <br />require the prospective.contractor to submit-a borrow area <br />development plan as part of the technical proposal. This plan <br />needs to include the following: <br />Method for efficient pit development and material <br />handling. <br />- Stripping (topsoil and waste),, waste (from processing), <br />and processed material stockpile areas. <br />- Location of construction access through the borrow area. <br />- Location of settling ponds, equipment and fuel storage <br /> <br />areas. <br />- Final configuration of the borrow area at the completion <br />of Stage I. <br />• <br /> <br />It is essential that stripping and waste material not be placed <br />on aggregate deposits that the Stage II contractor will be <br />required to develop. <br />E. AVAILABILITY OF WATER FOR CONSTRUCTION <br />Basin creek, an'intermittent tributary to the Animas River, flows <br />from a relatively small drainage basin and is located on the <br />northwest side of Borrow Area B. Interpretive flood hydrographs <br />and a table summarizing the 5-, 10-, and'25-year floods for <br />Ridges Basin Dam (located approximately 6,000 feet upstream of <br />VVeeminuche Construction A,;#J,rnas GLACt 61L GaAV4-L 9 <br />_'o0. Box $A 2IDwaoc, 8 i LL H-t 8 tT - PAGC T- t-j <br />
The URL can be used to link to this page
Your browser does not support the video tag.