Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 010 Page 2 of 2 <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 (AVG.) <br />0.900 (CAT HB)) <br />1.000 (GEN.) <br />1.000 (AVG. <br />0.830 (1 SHIFT/DAY) <br />0.900 (SSD-FC) <br />0.903 (CAT HB) <br />1.000 (CAT HB) <br />0.868 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.3952 <br />Adjusted unit production: <br />Adjusted fleet production: <br />692.71 LCY/hr <br />692.71 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.287/LCY <br />Total job time: 3.53 Hours <br />Total job cost: $701.41 <br />CIRCES Cost Estimating Software