Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Site <br />Site: Terror Creek Loadout Permit Action: 2011 Midterm Review Permit/Job#: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 29-Apr-11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />iption <br />-Scraper: Cat 621G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Scraner Work Team Rnnnnrt Fnninment MnintPnnnca Fmiinment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $46.12 NA NA NA NA NA <br />Operating cost/hour: $91.84 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $24.95 NA NA NA NA NA <br />Unit Subtotals: $162.91 NA NA NA NA NA <br />Number of Units: 1 0 0 0 0 0 <br />Group Subtotals: Work: $162.91 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $162.91 <br />MATERIAL QUANTITIES <br />Initial volume: 5,243 CCY Swell factor: 1.125 <br />Loose volume: 5,898 LCY <br />Source of estimated volume: Map 5; Page 2.05-5R <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: 2,550 lbs/LCY <br />Material description: Earth - Dry packed <br />Rated Payload: 48,000 pounds <br />Payload Capacity: 18.82 LCY <br /> <br />Struck Volume: 15.70 LCY <br />Heaped Volume: 22.00 LCY <br />Average Volume: 18.85 LCY <br />Adjusted Capacity: 18.82 LCY <br />Abbreviation: None <br />Filename: C059-011 <br />CIRCES Cost Estimating Software