Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Site: <br />Task description: Backfill Sediment and Dugout Ponds <br />Terror Creek Loadout Permit Action: 2011 Midterm Review Permit/Job#: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: <br />Date: 29-Apr-11 County: <br />User: JRS <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br /> <br />Basic Machine: Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $49.19 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL Q UANTITIES <br />Initial Volume: 2,175 <br />Swell factor: 1.125 <br />Loose volume: 2,447 LCY <br />Source of estimated volume: Map 7 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />65 feet <br />1.752.8 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Material weight: <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Average push gradient: <br />Average site altitude: <br />5% <br />5,800 feet <br />lbs/LCY <br />Abbreviation: None <br />Filename: C059-010 <br />CIRCES Cost Estimating Software