Laserfiche WebLink
MOTOR GRADER WORK <br />Task description: <br />Site: Terror Creek Loadout <br />Finish Grade Entire Site <br />Permit Action: 2011 Midterm Review Pennit/Job#: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: <br />Date: 29-Apr-11 County: <br />User: JRS <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14H <br />Ripper Attachment: <br />Cost Breakdown: <br />Horsepower: 215 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization % <br />Ownership Cost/Hour: $34.52 NA <br />Operating Cost/Hour: $53.14 100 <br />Ripper Operating Cost/Hour: $0.00 <br />Operator Cost/Hour: $24.47 NA <br />Total Unit Cost/Hour: $112.13 <br />Total Fleet Cost/Hour: $112.13 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 4.50 <br />acres <br />Source of estimated acreage: Map 5 <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.25 mph <br />Selected Application: Finish grading (0-2.5 mph) - 1.25 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 1.5303 acres/hour <br />Job Condition Correction Factors <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fav.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />1.3773 <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: <br />acres/Hour <br />acres/Hour <br />3.27 <br />Unit cost: $81.41 per acre Total job cost: $366.00 <br />Site Altitude: 5800 feet <br />1.3773 <br />Abbreviation: None <br />Filename: C059-009 <br />Hours <br />CIRCES Cost Estimating Software